Technician inspecting clear acrylic panels
Technician inspecting clear acrylic panels
Four checkpoints under an ISO 9001-certified system: incoming material verification, first-article inspection, in-process control, and final dimensional inspection before packing.
Reply within 12 hours · free DFM feedback
Our quality route starts at the actual material source. For cast acrylic manufactured in-house, process control starts with polymerisation and continues through finished-sheet inspection. For extruded acrylic and polycarbonate supplied by affiliated manufacturers, control starts with incoming lot verification against the quoted grade and documents. First-article, in-process and final inspection then apply to any cutting or fabrication. Review the bulk sheet quality route.
Every sheet lot is checked against the order source and documents — grade, thickness, optical condition and protective film. In-house cast acrylic follows the production-lot record; affiliated-source extruded acrylic and polycarbonate follow incoming verification.
The first part off any new drawing is measured dimension-by-dimension and documented in an FAI report before production continues. Revision changes trigger a new FAI.
Tool-wear schedules on CNC, bend-angle gauges at forming, annealing oven-cycle logs for every batch, and seam inspection under polarized light for bonded assemblies.
Dimensional check per AQL 2.5 sampling, visual inspection under defined lighting, protective film/foam packing, and pre-dispatch photos against the packing list.
Documentation matched to your QA system — tell us the format (PPAP-style or a plain report) and we match it.
Yes — dimensional reports per your PO requirement, plus certificates of conformity as standard. Tell us the format your QA system needs and we match it.
Same CNC programs, same material grade locked to your part number, and FAI comparison against the retained first-article data. Reorder consistency is the most common compliment we get.
Photograph and report within 30 days; confirmed non-conformances are remade and shipped at our cost. Claims are rare — the four checkpoints exist to keep it that way.
Photograph and report it within the acceptance window in the order terms; out-of-tolerance parts are eligible for replacement under our company-declared warranty rule, which follows the material and machining standards stated on the how-to-order page.
Yes. We support audits with company-declared ISO 9001 statements, order-level material and inspection documents, video walkthroughs and on-site audits by appointment.
A dimensional record of the critical features on the first part of a new drawing, measured against the drawing tolerance; the report is supplied on request and a drawing revision triggers a new one.
Quality control starts at the material source: in-house cast sheet follows its production-lot record, and incoming extruded acrylic and polycarbonate are verified against the quoted grade and documents. In-process control covers tool-wear schedules, bend-angle gauges, annealing oven-cycle logs and seam inspection; final inspection applies dimensional checking, visual inspection and pre-dispatch photos.
Supplier audits can be supported with a company-declared quality management statement, order-level material and inspection documents, and a video walkthrough or on-site audit. Certificate details are supplied on request, not published, and no certificate number or validity period is stated here.
A certificate of conformity on production orders, first-article reports on new drawings, and dimensional or material certificates on request per order; report format, PPAP-style or plain, is agreed at the quote stage. Inspection levels, sampling and reporting formats are confirmed per order.
Tell us your inspection requirements and we’ll match them in the quote.
Technical details
Technician inspecting clear acrylic panels
Gantry crane in the fabrication workshop
Technical details
In-process control covers tool-wear schedules on CNC, bend-angle gauges at forming, annealing oven-cycle logs for every batch, and seam inspection for bonded assemblies.
Company-declared
The first part off any new drawing is measured dimension-by-dimension and documented in a first-article inspection report before production continues; a drawing revision triggers a new first-article, and reorders run on the same CNC programs with the material grade locked to the part number, which gives each order a direct traceability link to its first article.
Final inspection applies dimensional checking under an agreed sampling plan, visual inspection under defined lighting, protective packing and pre-dispatch photos against the packing list.
Documentation is matched to your QA system: a certificate of conformity on production orders, first-article reports on new drawings, and dimensional or material certificates on request per order; report format, PPAP-style or plain, is agreed at the quote stage.
For supplier audits we can support with a company-declared ISO 9001 statement, order-level material and inspection documents, and a video walkthrough or on-site audit; certificate details are confirmed on request.
The detail behind each checkpoint is published separately: batch traceability from incoming material to first article and reorder, the quality document library of certificates, material data and inspection reports, the warranty and claims rules covering acceptance, rework and transport damage, and the acrylic appearance acceptance standard for A/B faces, scratches, haze and bonded seams.
| Choose this when | Do not choose this when | Level |
|---|---|---|
| You need a dimensional report on every production order | Your acceptance is based on the certificate of conformity only | Dimensional report per PO requirement |
| Your QA system expects PPAP-style documentation | A plain report format is sufficient | PPAP-style or plain report, agreed at quote |
| A new drawing or a revision changed the part | The part is an unchanged reorder | New first-article inspection per drawing revision |
| You require third-party pre-shipment inspection | You inspect parts on arrival at your own site | Third-party inspection arranged per order |
| Property | Value | Unit | Product grade | Thickness specimen | Test method / standard | Evidence status | Qualification | Claim IDs |
|---|---|---|---|---|---|---|---|---|
| Incoming material verification | Grade, thickness, optical condition and protective film checked against the quoted order source and documents | n/a | Affiliated-source extruded acrylic and polycarbonate; in-house cast sheet | As-delivered sheet lot | Order source documents and lot record | company-declared process | Lot-control evidence pending | |
| First-article inspection | Critical features measured on the first part of a new drawing | mm per drawing | Order-specific acrylic grade | Order-specified specimen | Drawing tolerance; first-article report | company-declared process | Report on request; revision triggers a new first-article | AF-C11 |
| In-process control | Tool-wear schedules, bend-angle gauges, annealing oven-cycle logs, bonded-seam inspection | n/a | Fabricated acrylic parts | Order-specified | Process control records | company-declared process | Annealing follows the cast-acrylic industry-standard schedule | AF-C10 |
| Final inspection and packing | Dimensional check under agreed sampling, visual inspection under defined lighting, protective packing, pre-dispatch photos | n/a | Fabricated acrylic parts | Order-specified | Agreed sampling plan and packing specification | company-declared process | Sampling plan agreed per order | |
| Documentation | Certificate of conformity, first-article report, dimensional report, material certificate | n/a | Order-specific | Order-specified | Per order and purchase order | company-declared | Report format agreed at quote stage | |
| Compliance evidence | ISO 9001 quality management system | n/a | n/a | n/a | Certificate details on request | company-declared | Certificate number, validity and scope pending | AF-C08 |