How to Order Custom Acrylic Parts

Five steps from drawing to delivery: send a drawing, get free DFM feedback, approve the quote, confirm a sample, release production. Drawing to shipped sample is usually about a week.

Reply within 12 hours · free DFM feedback

Laser-cut amber acrylic gasket produced from a customer drawing

From CAD to machined part

Ordering custom acrylic fabrication follows five steps: send a drawing or sketch, receive design-for-manufacturing feedback, approve the quote, confirm a sample or first article, then release production. From drawing to shipped sample typically takes 48 hours; production adds 7 days plus freight.

The five steps

  1. Send your drawing

    STEP, DWG, DXF or PDF — or a dimensioned sketch / sample-part photos. Include material & thickness (or ask us), quantity and application.

  2. DFM feedback & quote

    Within 12 hours an engineer reviews manufacturability — radii, vent spacing, bend feasibility — and replies with a quote or specific questions. DFM review is free and often trims cost. More commercial questions — MOQ, payment, samples — are answered in our acrylic fabrication FAQ.

  3. Approve quote & terms

    Quote covers unit price at your quantities, tooling if any, lead time, packing and shipping terms. NDA before or after quoting — your choice.

  4. Sample / first article

    You receive the physical sample (or FAI report) in 48 hours. Production starts only after your written approval — changes at this stage are free.

  5. Production & delivery

    Production per the approved sample, final inspection, pre-shipment photos, then dispatch — courier for samples, air or sea freight for volume (7 days + freight).

What gets you the fastest accurate quote

Four things:

  • Drawing in any format (or a dimensioned sketch)
  • Material & thickness — or the application so we can recommend
  • Quantity, with future volumes if known
  • Destination country for freight

With all four, quotes usually go out same-day.

Send Your Drawing — Get a Quote in 12 Hours

FAQ

What information gets me the fastest accurate quote?

Four things: drawing (any format), material & thickness (or the application), quantity (with future volumes if known), and destination country for freight. With all four, quotes usually go out same-day.

What are your payment terms?

Typically 30% T/T deposit with the balance before shipment; PayPal is accepted for samples. FOB, CIF and DDP terms are available.

Can you hold my drawings and reorder later?

Yes — drawings, programs, material specs and retained FAI data stay on file under your part number, so reorders need only a PO and match the original batch.

Do you offer Incoterms like DDP?

Yes — we quote FOB, CIF and DDP depending on your destination and preference.

What information gets the fastest accurate quote?

A drawing in any accepted format, material and thickness (or the application so we can recommend), quantity with future volumes, and the destination country; with all four, quotes usually go out the same day.

How long do samples and production take?

For typical CNC parts, samples are ready 48 hours after drawing approval and production runs start in 7 days; bonded, thermoformed, large-format and high-volume orders get a separate schedule after drawing review.

What are your payment and shipping terms?

Deposit and balance terms are confirmed in the quote, with bank transfer standard and PayPal accepted for samples; FOB, CIF and DDP can be quoted depending on destination and preference.

What happens if a part is out of tolerance?

Report it with photos within the acceptance window in the order terms; out-of-tolerance parts can be replaced under our company-declared warranty, which follows the material and machining standards confirmed at ordering.

What happens if my acrylic parts arrive with defects?

Report the issue with photos within the acceptance window in the order terms. Out-of-tolerance parts can be replaced under the company-declared warranty, which follows the material standard GB/T 7134 and machining per GB/T 1804-2000 / ISO 2768; rework, replacement and claim deadlines are confirmed in the quote and order.

Who is responsible if goods are damaged in transit?

Transport damage responsibility follows the agreed Incoterm and packaging specification; damaged goods are reported on arrival per the order terms with photos and the packing list. The quote confirms the Incoterm, packaging level and how damage claims are handled for your destination.

What information does a fabricator need to quote my acrylic parts accurately?

A drawing in any accepted format, material and thickness or the application so a grade can be recommended, quantity with future volumes, and the destination country. With all four, engineers review manufacturability and reply with a quote or specific questions within 12 hours on working days.

Start at step one

Send your drawing now and get a quote within 12 hours.

Evidence and verification

  • Quote terms, first-article reports and order documentation are supplied per order.
  • A certificate of conformity or batch COA can be supplied per order on request.
  • Warranty, lead-time and service commitments on this page are company-declared by AcrylicFabWorks unless stated otherwise.
  • Applicable product grade: Cast and extruded acrylic (PMMA); polycarbonate fabrication
  • Fact owner: Commercial and quality review, AcrylicFabWorks
  • Last reviewed: 2026-08-27

Technical details

Factory & quality system

Acrylic panel windows staged for quality inspection

Acrylic panel windows staged for quality inspection

Acrylic panel windows staged for quality inspection

Technical details

Ordering & lead times

The five ordering steps

Commercial policy

Sample and production lead times

Samples are typically ready 48 hours after drawing approval and production runs start in 7 days for typical CNC parts, so the lead time runs from drawing approval; complex 5-axis, bonded, thermoformed, large-format and high-volume orders are evaluated separately with their own schedule.

The warranty basis

Our company-declared warranty follows the cast-acrylic national standard GB/T 7134 for material, machining per GB/T 1804-2000 / ISO 2768, and out-of-tolerance parts can be replaced; the acceptance window and claim steps are confirmed in the order terms.

Technical details

Choosing the right route

Engineering review and quoting

An engineer reviews manufacturability and replies with a quote or specific questions within 12 hours; DFM review is free and often trims cost.

What stays on file

Drawings, programs, material specifications and retained first-article data stay on file under your part number, so a reorder needs only a purchase order and matches the original batch.

Changes and transport claims

Engineering changes require written approval of the revised drawing; a revision triggers a new first-article inspection, and transport damage is handled through the carrier claim with photos and packing records.

Sample-to-production lead time by part class

Choose this when Do not choose this when Lead time Claim IDs
Your part is a typical CNC-machined acrylic part with an approved drawing Your order is bonded, thermoformed, large-format or high-volume Sample in 48 hours; production in 7 days from drawing approval AF-C09
Your part needs 5-axis, bonded, thermoformed or large-format work Your part is a standard flat-profile CNC part Schedule confirmed after drawing review; separate evaluation AF-C09
Your order volume is high or requires staged delivery You need a single sample or prototype first Production plan confirmed per order
You need a physical sample before production release A first-article report is sufficient for your QA Sample or first-article before production, per agreement

Warranty and claim handling

Choose this when Do not choose this when Action Claim IDs
A part is measured out of tolerance against the approved drawing The deviation was approved in writing at ordering Eligible for replacement under the company-declared warranty rule AF-C19
Material does not match the quoted grade or standard Material was substituted with your written approval Material claim follows the cast-acrylic national standard GB/T 7134 AF-C19
Parts are damaged in transit Damage happened after your receiving inspection Carrier claim with photos and packing records within the order terms
You changed the design after production release The change is a new revision before production Revised drawing approval and new first-article; quote updated

Lead time applicability conditions

Property Value Unit Product grade Thickness specimen Test method / standard Evidence status Qualification Claim IDs
Engineering review and quote Within 12 hours hours Typical acrylic fabrication inquiries n/a Company service commitment company-declared Working hours Mon-Sat 9:00-18:00 GMT+8; drawing-completeness exceptions apply AF-C13
Sample lead time 48 hours from drawing approval hours Typical CNC parts Order-specified Company commitment company-declared Complex, bonded, thermoformed, large-format and volume orders need separate evaluation AF-C09
Production lead time 7 days from drawing approval days Typical CNC parts Order-specified Company commitment company-declared Plus freight; confirmed per order AF-C09
Lead time clock start Drawing approval, plus sample approval where required n/a All fabricated parts n/a Order terms commercial policy Deposit and approval dependencies confirmed in quote

Warranty and responsibility conditions

Property Value Unit Product grade Thickness specimen Test method / standard Evidence status Qualification Claim IDs
Material warranty Per the cast-acrylic national standard GB/T 7134 n/a Cast acrylic parts Order-specified GB/T 7134 company-declared Applies to material conformity for the quoted grade AF-C19
Machining warranty Per GB/T 1804-2000 / ISO 2768 and the approved drawing n/a Machined acrylic parts Order-specified GB/T 1804-2000; ISO 2768 company-declared Confirmed per drawing and first-article AF-C19
Out-of-tolerance parts Can be replaced n/a Machined acrylic parts Order-specified Order terms company-declared Claimed within the acceptance window in the order terms AF-C19
Acceptance window Confirmed in the order terms n/a All parts n/a Order terms commercial policy Buyer reports non-conformance with photos within the window
Transport damage Carrier claim with photos and packing records n/a All parts n/a Order terms and Incoterm commercial policy Responsibility per Incoterm
Engineering changes Written approval of the revised drawing; new first-article n/a Fabricated parts n/a Change process per order company-declared Quote updated for rework AF-C11