Acrylic panel windows staged for quality inspection
Acrylic panel windows staged for quality inspection
Five steps from drawing to delivery: send a drawing, get free DFM feedback, approve the quote, confirm a sample, release production. Drawing to shipped sample is usually about a week.
Reply within 12 hours · free DFM feedback
Ordering custom acrylic fabrication follows five steps: send a drawing or sketch, receive design-for-manufacturing feedback, approve the quote, confirm a sample or first article, then release production. From drawing to shipped sample typically takes 48 hours; production adds 7 days plus freight.
STEP, DWG, DXF or PDF — or a dimensioned sketch / sample-part photos. Include material & thickness (or ask us), quantity and application.
Within 12 hours an engineer reviews manufacturability — radii, vent spacing, bend feasibility — and replies with a quote or specific questions. DFM review is free and often trims cost. More commercial questions — MOQ, payment, samples — are answered in our acrylic fabrication FAQ.
Quote covers unit price at your quantities, tooling if any, lead time, packing and shipping terms. NDA before or after quoting — your choice.
You receive the physical sample (or FAI report) in 48 hours. Production starts only after your written approval — changes at this stage are free.
Production per the approved sample, final inspection, pre-shipment photos, then dispatch — courier for samples, air or sea freight for volume (7 days + freight).
What gets you the fastest accurate quote
With all four, quotes usually go out same-day.
Four things: drawing (any format), material & thickness (or the application), quantity (with future volumes if known), and destination country for freight. With all four, quotes usually go out same-day.
Typically 30% T/T deposit with the balance before shipment; PayPal is accepted for samples. FOB, CIF and DDP terms are available.
Yes — drawings, programs, material specs and retained FAI data stay on file under your part number, so reorders need only a PO and match the original batch.
Yes — we quote FOB, CIF and DDP depending on your destination and preference.
A drawing in any accepted format, material and thickness (or the application so we can recommend), quantity with future volumes, and the destination country; with all four, quotes usually go out the same day.
For typical CNC parts, samples are ready 48 hours after drawing approval and production runs start in 7 days; bonded, thermoformed, large-format and high-volume orders get a separate schedule after drawing review.
Deposit and balance terms are confirmed in the quote, with bank transfer standard and PayPal accepted for samples; FOB, CIF and DDP can be quoted depending on destination and preference.
Report it with photos within the acceptance window in the order terms; out-of-tolerance parts can be replaced under our company-declared warranty, which follows the material and machining standards confirmed at ordering.
Report the issue with photos within the acceptance window in the order terms. Out-of-tolerance parts can be replaced under the company-declared warranty, which follows the material standard GB/T 7134 and machining per GB/T 1804-2000 / ISO 2768; rework, replacement and claim deadlines are confirmed in the quote and order.
Transport damage responsibility follows the agreed Incoterm and packaging specification; damaged goods are reported on arrival per the order terms with photos and the packing list. The quote confirms the Incoterm, packaging level and how damage claims are handled for your destination.
A drawing in any accepted format, material and thickness or the application so a grade can be recommended, quantity with future volumes, and the destination country. With all four, engineers review manufacturability and reply with a quote or specific questions within 12 hours on working days.
Send your drawing now and get a quote within 12 hours.
Technical details
Acrylic panel windows staged for quality inspection
Technical details
Commercial policy
Samples are typically ready 48 hours after drawing approval and production runs start in 7 days for typical CNC parts, so the lead time runs from drawing approval; complex 5-axis, bonded, thermoformed, large-format and high-volume orders are evaluated separately with their own schedule.
Our company-declared warranty follows the cast-acrylic national standard GB/T 7134 for material, machining per GB/T 1804-2000 / ISO 2768, and out-of-tolerance parts can be replaced; the acceptance window and claim steps are confirmed in the order terms.
Technical details
An engineer reviews manufacturability and replies with a quote or specific questions within 12 hours; DFM review is free and often trims cost.
Drawings, programs, material specifications and retained first-article data stay on file under your part number, so a reorder needs only a purchase order and matches the original batch.
Engineering changes require written approval of the revised drawing; a revision triggers a new first-article inspection, and transport damage is handled through the carrier claim with photos and packing records.
| Choose this when | Do not choose this when | Lead time | Claim IDs |
|---|---|---|---|
| Your part is a typical CNC-machined acrylic part with an approved drawing | Your order is bonded, thermoformed, large-format or high-volume | Sample in 48 hours; production in 7 days from drawing approval | AF-C09 |
| Your part needs 5-axis, bonded, thermoformed or large-format work | Your part is a standard flat-profile CNC part | Schedule confirmed after drawing review; separate evaluation | AF-C09 |
| Your order volume is high or requires staged delivery | You need a single sample or prototype first | Production plan confirmed per order | |
| You need a physical sample before production release | A first-article report is sufficient for your QA | Sample or first-article before production, per agreement |
| Choose this when | Do not choose this when | Action | Claim IDs |
|---|---|---|---|
| A part is measured out of tolerance against the approved drawing | The deviation was approved in writing at ordering | Eligible for replacement under the company-declared warranty rule | AF-C19 |
| Material does not match the quoted grade or standard | Material was substituted with your written approval | Material claim follows the cast-acrylic national standard GB/T 7134 | AF-C19 |
| Parts are damaged in transit | Damage happened after your receiving inspection | Carrier claim with photos and packing records within the order terms | |
| You changed the design after production release | The change is a new revision before production | Revised drawing approval and new first-article; quote updated |
| Property | Value | Unit | Product grade | Thickness specimen | Test method / standard | Evidence status | Qualification | Claim IDs |
|---|---|---|---|---|---|---|---|---|
| Engineering review and quote | Within 12 hours | hours | Typical acrylic fabrication inquiries | n/a | Company service commitment | company-declared | Working hours Mon-Sat 9:00-18:00 GMT+8; drawing-completeness exceptions apply | AF-C13 |
| Sample lead time | 48 hours from drawing approval | hours | Typical CNC parts | Order-specified | Company commitment | company-declared | Complex, bonded, thermoformed, large-format and volume orders need separate evaluation | AF-C09 |
| Production lead time | 7 days from drawing approval | days | Typical CNC parts | Order-specified | Company commitment | company-declared | Plus freight; confirmed per order | AF-C09 |
| Lead time clock start | Drawing approval, plus sample approval where required | n/a | All fabricated parts | n/a | Order terms | commercial policy | Deposit and approval dependencies confirmed in quote |
| Property | Value | Unit | Product grade | Thickness specimen | Test method / standard | Evidence status | Qualification | Claim IDs |
|---|---|---|---|---|---|---|---|---|
| Material warranty | Per the cast-acrylic national standard GB/T 7134 | n/a | Cast acrylic parts | Order-specified | GB/T 7134 | company-declared | Applies to material conformity for the quoted grade | AF-C19 |
| Machining warranty | Per GB/T 1804-2000 / ISO 2768 and the approved drawing | n/a | Machined acrylic parts | Order-specified | GB/T 1804-2000; ISO 2768 | company-declared | Confirmed per drawing and first-article | AF-C19 |
| Out-of-tolerance parts | Can be replaced | n/a | Machined acrylic parts | Order-specified | Order terms | company-declared | Claimed within the acceptance window in the order terms | AF-C19 |
| Acceptance window | Confirmed in the order terms | n/a | All parts | n/a | Order terms | commercial policy | Buyer reports non-conformance with photos within the window | |
| Transport damage | Carrier claim with photos and packing records | n/a | All parts | n/a | Order terms and Incoterm | commercial policy | Responsibility per Incoterm | |
| Engineering changes | Written approval of the revised drawing; new first-article | n/a | Fabricated parts | n/a | Change process per order | company-declared | Quote updated for rework | AF-C11 |